Help You Confirm Key Specs for Accurate Quoting
□ Dry-Type Transformer (Oil-Free) (Indoor/commercial use, fireproof & moisture-resistant)
□ Oil-Immersed Transformer (with Insulating Oil) (Outdoor/industrial use, high-capacity heat dissipation)
Please provide the calculated capacity (e.g., 100kVA / 500kVA)Calculation
Reference: Capacity = Total Load Power (kW) × Coincidence Factor ÷ Power Factor
□ Single-Phase 🏠 (Residential/small loads)
□ Three-Phase 🏭 (Industrial/large loads)
□ Copper (Cu) 🟡 (High conductivity, ideal for critical loads)
□ Aluminum (Alu) 🟢 (Cost-effective, suitable for general loads)
□ 50Hz (Asia/Europe)
□ 60Hz (North America/Latin America)
Power loss under full load
Specify requirement: ______
Power loss when idle (affects long-term energy costs)
Specify requirement: ______
Provide design requirements or reference examples
(e.g., Dyn11 / Yyn0 – leave blank for our recommendation if unsure)
Choose based on load type
□ 4% (Low-voltage distribution)
□ 6% (Industrial surge protection)
□ Other: ______
□ On-Load Tap Changer ⚡ (Voltage regulation under load, industrial preference)
□ Off-Load Tap Changer ⚡ (Manual adjustment during shutdown, basic model)
Adjustment range: ±______% (e.g., ±5%)
□ IP20 (Indoor dust protection)
□ IP54 (Outdoor dustproof & waterproof)
□ Other: ______
WhatsApp us
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.
Submit your project requirements today, our engineers will deliver a tailored transformer solution within 24 hours.